Click OK in the Accounts Settings window to return to the main Thunderbird window.įor additional help or support contact Wizards Technical Support at (877) 457-9669. and the outgoing one will change automatically. Change the Username for incoming to your full email address (i.e.Change Port for incoming from 143 to 993.Change the Server hostname for Incoming and Outgoing to.Wait for the default settings to load and click Manual config.Enter Your Name, Email Address, and Password click Continue.Click the Account Actions button in the Account Settings window and then click on Add Mail Account.Go to the File menu (three horizontal lines), then go to Options, and select Account Settings.You can download Thunderbird at /thunderbird If you aren't sure which account is which, figure out which server configuration is right by looking for, , and/or (where N are different numbers), and then find set to the correct serverN.If you have an email address other than please see our Email Settings for Email Clients article. Then change defaultaccount from account4 to account12. Find and change it, if necessary, to be equal to the account you want to come first.įor example, if the value of accounts is account4,account5,account12, reflecting a well-worn profile, and you want the third account to be first, change it to account12,account4,account5.Using the built-in config editor (or editing prefs.js directly), find the preference, and change the sequence of the comma-separated account references in it.Backup your profile directory (and most especially prefs.js).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |